2015 Audi Neckarsulm

 
Project AUDI in Neckarsulm

AF Circular Flanges and SR Joining Clips

The METU AF circular flanges are unloaded from the lorry.

 

They are then loaded on the large platform of the elevator.

 

The operator of the elevator makes sure that
the bundles are correctly secured.